DETAIL
DRAWINGS
|
|
| ALUMAGUARD | DATE |
JPG |
PDF
|
| Alumaguard Sealing to Equipment | 11-15-11 |
||
| Insulating Duct at Supports 1 | 11-15-11 |
||
| Insulating Duct on Supports 2 | 11-15-11 |
||
| Typical Duct Seal @ Air Handler | 11-15-11 |
||
| Typical Roof Penetration of HVAC Ducts | 11-15-11 |
||
| VAPOR GUARD | |||
| Ammonia System Termination Detail Drawing | 6-28-11 |
||
| Expansion Joint on Cold Piping System Detail Drawing | 3-2-12 |
||
| Through Insulation Stop | 3-30-12 |
||
| Vapor Stop Detail Drawing | 3-7-12 |
||
| ZERO PERM | |||
If
DWG or CAD |
|||
Our NEWEST products! |
![]() |
|
| Pipe with RG-2400 | Pipe with-out RG-2400 | |
Home / Architectural / Highway / Pipeline / Mechanical / Residential / © 2012 Polyguard Products, Inc. All Rights Reserved. |
|